Renovating a bathroom: where do you start?

A bathroom renovation checklist starts with a plan, not with picking tiles. Measure the room, door and alcoves, mark the soil stack, water points and sockets, collect quotes and put the job in writing. Only then do you buy materials and fix the order of work, from stripping out to fitting the sanitaryware and lighting.

Where can the toilet and shower go?

The soil stack usually stays where it is, so it decides where the toilet can go. Moving the outlet further from the stack typically means raising the floor or a bigger rebuild. Draw the layout with the stack in it before you choose any fittings.

Add door sizes, alcoves and the existing vent on the drawing. These limit where a shower enclosure, a bath or a washing machine will fit.

What if it is the only bathroom?

A typical bathroom renovation takes several weeks, and for part of that time the bathroom does not work. If it is the only one in the home, arrange a stand-in: family, friends, a gym with showers. It is an item on the list that is easy to forget and that you feel most in the second week.

Warn everyone at home about the days without water and agree where they will wash. Plan this especially carefully with small children or older relatives.

How do you choose a contractor and write the contract?

Get two or three quotes from contractors, ideally after a site visit. Compare the scope of work, not only the final price. Ask for references and photos of similar bathrooms.

Put the contract in writing: the scope of work, who buys materials, the dates, staged payments and how the job is signed off. It makes it easier to settle accounts and to claim for faults.

What rules should you check before renovating?

In England, some bathroom work must be notified to building control. GOV.UK lists new bathroom installations where plumbing is added or altered, and electrical work around baths and showers. Like-for-like replacements of a bath, toilet or basin do not need notifying. If you use an installer registered with a competent person scheme, they notify the local authority and issue a certificate of compliance. If it has not arrived within 30 days of the work finishing, contact the scheme operator.

Rules differ elsewhere. In Poland, for example, the national building inspectorate explains that building, removing or moving non-structural partition walls inside a flat is not construction work at all, and interior design falls outside building law. Load-bearing walls are a different matter wherever you live, so do not touch one without professional advice.

Do you need a carbon monoxide alarm in the bathroom?

If the bathroom has a gas water heater, keep its ventilation working and fit a carbon monoxide alarm. Polish fire service guidance lists bathrooms with gas water heaters among the rooms where an alarm is needed. It says to mount it about 2 metres from the appliance in a straight line (the source gives a range of 1 to 3 m), and not next to an air vent or covering one.

Leave any work on the gas installation to a qualified person. In a block of flats, ask the building manager about noise hours, where rubble can go and whether replacing valves on the riser means shutting off water for other flats. Warn the neighbours about the dates.

GOV.UK: Building work, replacements and repairs to your homeGUNB: Ciekawe interpretacje GUNB, prace dotyczące ściany działowej a pozwolenie na budowę

In what order should bathroom work be done?

The order is simple: strip out first, then plumbing and electrics, waterproofing, tiles, sanitaryware and lighting. Changing the order usually means breaking up fresh tiles. The table shows each stage and what you need to handle:

Bathroom renovation stages and the owner's tasks
StageWhat happensWhat you do
Strip outRemoving tiles and old fittingsShut off water, protect the stairwell and lift
ServicesPipes, drains, cablesCheck valves and the position of water points
WaterproofingLayer under tiles in the shower area and on the floorAsk for photos before the tiles go on
Tiles and groutLaying tiles, grouting, sealantOrder spare tiles
Fitting outBasin, toilet, taps, shower enclosureSign off the work with the contractor
FinishingLighting, mirror, accessoriesCollect invoices and guarantees

Everything is ready to tick off: the bathroom renovation list in BuyNest combines tasks and shopping in groups from planning to sign-off.

What should you check in the plumbing, electrics and waterproofing?

A renovation is a good moment to check the pipes and valves. An old valve that does not shut the water off fully is easier to replace with the wall open than after the tiles are on.

Electrics in a bathroom are a job for a qualified electrician. Water and electricity call for the right zones around the bath and shower, suitably rated fittings and protection. Choose lights and a lit mirror marked for damp rooms.

Waterproofing under the tiles in the shower area and on the floor protects the ceiling below and the neighbour's flat from leaks. Check that the contractor has included it in the quote, and ask for a photo before the tiles are laid.

Keep ventilation in mind. A working vent or fan takes moisture away, and without it mould soon appears on grout and ceiling. After the job, ask the electrician for the paperwork for the work done if you are entitled to it.

What do you need to buy for a bathroom renovation?

Shopping is easier to plan once you know what fits the layout. These are the groups from the list, from finishing materials to small items, for a bathroom with a shower or a bath:

  • wall and floor tiles with a spare allowance for cuts and replacements, the size of which you should agree with the tiler,
  • waterproofing, adhesive and grout, ideally from one maker so the layers suit each other,
  • sanitary sealant in the grout colour, two tubes,
  • bathroom paint for the ceiling if it will not be tiled,
  • bath or shower tray, and an enclosure or screen,
  • basin with a unit, toilet with a frame, two taps, a linear drain or a trap,
  • mirror and lighting for a damp area, and a bathroom radiator,
  • small items: hooks, a shelf, a toilet roll holder, a toilet brush, a mat and a shower curtain.

Keep the spare tiles after the job, because the same pattern from the same batch is hard to buy later. For what comes next in a newly bought place, see our guides on the new-build handover checklist and the new home checklist.

How do you set a budget for a bathroom renovation?

Split the budget into three parts: labour, materials and fittings, then add a reserve for things that only show once the old tiles come off. Old pipework or an uneven wall can change the scope of work.

Base figures on your own quotes, not on general rates found online, because prices depend on the city, the standard and the date. Keep every quote in one place so you compare the scope, not only the total.

Staged payments help you keep control. Leave the last part until sign-off, when you have checked the falls, the grout, the taps and the ventilation.

How do you sign off a bathroom renovation?

Do the sign-off with the contractor, in good light. Check that water runs to the drain and does not stand on the floor, that taps do not leak and that the sealant at the bath or tray is watertight. Switch on the fan and look closely at the grout.

After the job, keep invoices, guarantees for fittings and the electrician's paperwork, if applicable. Put the spare tiles and grout aside. Plan the first clean-up using our deep cleaning checklist.

How do you manage the renovation in BuyNest?

Import the list into BuyNest and share it with the person you are renovating with. Assign the items in the „Finishing” and „Fittings” groups to DIY stores, and tick off planning and sign-off tasks as you complete them.

Enter delivery dates for tiles and fittings as reminders. After the job, save the list as a template for the next project. More lists are in the home lists section.

Bathroom renovation

  • Planning
  • Measure the room and door
  • Draw the layout with the soil stack
  • Ask the building manager about rules
  • Get 2-3 quotes
  • Written contract with the builder
  • Plan a backup bathroom family, gym
  • Pipes and wiring
  • Qualified electrician zones near the bath
  • Check pipes and stop valves
  • Extractor fan or clear vent
  • Carbon monoxide alarm if there is a gas heater
  • Finishes
  • Wall tiles with spare
  • Floor tiles with spare
  • Waterproofing membrane
  • Tile adhesive and grout
  • Sanitary sealant2 pcs
  • Bathroom paint for the ceiling
  • Fixtures
  • Bath or shower tray
  • Shower enclosure or screen
  • Basin with vanity unit
  • Toilet and frame
  • Taps and mixer2 pcs
  • Drain or trap
  • Mirror and lighting rated for bathrooms
  • Towel radiator
  • Small items
  • Hooks and a shelf
  • Toilet roll holder and brush
  • Bath mat and curtain
  • After the work
  • Walk through the work with the builder
  • Keep spare tiles
  • Keep invoices and warranties
  • Get the electrical certificate within 30 days in England

Bathroom renovation

Scan the code with your phone or open the same list with the button. If the app is not installed, the store buttons remain. The list is not kept automatically after you install it.

Open in BuyNest

Need the app?

Download on the App StoreGet it on Google Play

Frequently asked questions

Where do you start a bathroom renovation?

Start by measuring the bathroom, marking the soil stack and water points and collecting two or three quotes. Choose tiles and fittings only once you know the layout.

Does a bathroom renovation need planning permission?

Work inside a flat, such as replacing tiles or fittings, usually does not. Poland's building inspectorate explains that changing non-structural partition walls inside a flat is not construction work. Do not touch a load-bearing wall without a design, and if in doubt ask the building control office.

How long does a bathroom renovation take?

Usually several weeks, but it depends on the scope and the contractor. Agree dates in the contract and arrange somewhere to wash while the bathroom is out of use.

Do you need a carbon monoxide alarm in the bathroom?

If the bathroom has a gas water heater, yes. Polish fire service guidance lists such bathrooms among the places where an alarm is needed. Mount it about 2 metres from the appliance (the source gives 1 to 3 m) and not next to an air vent.

How many spare tiles should you buy?

It depends on the layout and the pattern. Agree the figure with the tiler from the drawing and keep the surplus for future repairs, because the same batch may not be available later.

Measure your bathroom today and draw the layout with the soil stack before you order a single tile. A bathroom renovation checklist on your phone keeps things moving, because tasks and shopping sit in one place and the other person sees what is already done.

Open the ready list in BuyNest

Sources

Take the shopping into BuyNest

BuyNest is on iPhone and Android. The app has no ads, including on the free plan.

Download on the App StoreGet it on Google Play

Related guides

New home checklist: 120 things to buy, room by roomKitchen Essentials Checklist: What You Need to StartMoving house checklist: 8 weeks before and the first week after